Sponsored

Progress of work on the BTEI (Bureau d'Etudes Techniques et d'Ingénierie) site

2
11K

​​📌What's going on at the "Sovelmash" D&E construction site today? 

 

At the D&E site, the utility sewer is being connected, sand backfilling is in progress, work is underway to connect the heating system, and preparations are being made to connect the storm drainage system. 

 

Dmitriy Duyunov: "There is some chance that today could be a landmark day. After months of extensive and strenuous work to install the engineering networks, the first of these (utility sewerage) has reached its connection point. All what's left is to make the connection. Now the entire pavement in front of our site, from gate to gate, is cluttered with pallets of construction mixtures for finishing the O&A. The installation of the heating pipes on the second and third floors of the O&A has been completed and moved to the 1st floor." 

 

It's high time to build up your investment portfolio and support the project! The construction pace depends on the rate of funding.

https://reg.solargroup.pro/amx480/06

https://reg.solargroup.pro/amx480

 

Like
Yay
6
Search
Categories
Read More
Food
草本烤核桃
草本烤核桃,香浓脆酥
By Td Ego 2023-10-16 23:09:49 1 9K
Home
严重飘扬
严重飘扬蛋总长期以来无私滴付出 👍👍👍
By 奶瓶 大侠 2023-05-21 22:30:44 3 9K
Networking
Don't Miss Out on 45 Million Pioneers Boosting Your Business!
In the ever-evolving landscape of travel services, there's a game-changer in town, and it's time...
By Pitogo 2024-01-16 07:40:48 109 31K
Art
이태와이시
귀여운이들 이태,이시 사랑해
By Ljino K1004 2023-07-23 12:31:42 4 9K
Home
Crypto News
Ex-CTO của Coinbase: đồng đô la không quá lớn và sẽ được thay thế bằng...
By Qalab A1985 2023-03-27 02:59:18 3 10K