Sponsored

"Sovelmash" D&E construction site today Asphalt paving, installation of heating mains and other activities

2
13K

​​📌"Sovelmash" D&E construction site today | Asphalt paving, installation of heating mains and other activities 

 

At the main entrance to the O&A, the ground level has grown considerably from what you may have seen in one of the latest videos. The geotextile was installed and backfilling with sand commenced. This area will be levelled and prepared for asphalt paving, and so will be the area at the rear of the building, near the ramp. 

 

Due to the fact that the level of the heating mains utilities turned out to be higher than expected, it was necessary to dismantle the concrete bedding and dig a bit deeper in order to bypass the utilities. As of today, these tasks have been completed. 

 

Watch the video https://youtu.be/GwBaA-k3exw

for an overview of the work performed at the construction site.

Participate in the project by registering through our link

https://reg.solargroup.pro/amx480/06

https://reg.solargroup.pro/amx480

 

Like
Love
Yay
6
Search
Categories
Read More
Home
Pi network
Ngày ấy sắp đến.
By Anhkiet77 Huynh 2023-05-31 03:57:09 8 10K
Home
Pi Network
Mỗi sự khởi đầu đều gian nan 
By Qalab A1985 2023-06-01 13:04:14 3 11K
Art
派花🌺
㊗派友们有钱花,各种花🌺随便花…
By Juliang Chen 2023-05-14 02:29:15 4 9K
Other
屋脊上奔走的凤凰
中国大地很多的人文大多数都展示在各种各样的建筑和雕刻雕塑上,就如这屋脊上奔走的凤凰鸟!
By Yh Lin 2023-08-07 12:25:32 4 7K
Home
Thiên nhiên
Chống chọi trước cơn bão.👍👍👍
By Anhkiet77 Huynh 2023-05-13 11:02:37 7 9K