https://youtu.be/aUn_lomqL6s

 

 

Wells have been installed at the main entrance to the building, the ground has been levelled, the geotextile has been installed, and backfilling with sand has been carried out. This area will subsequently be covered with crushed stone and ready for asphalt paving. 

 

A chamber has been installed to supply water to the building. Cold water supply is being connected to enable the fire safety system to operate. 

 

The grounding work is nearing completion. To the right of the building, preparations are underway to accept asphalt concrete. 

 

Outside the construction site, the excavation work is being carried out to connect the heating pipeline. 

 

Concrete bedding and waterproofing have been completed, trays are being installed, and pipes are being removed from the territory of "Sovelmash". Very soon the heating line will be looped and hot water will be supplied. 

 

All the lines have been connected to provide cold water supply. 

 

The sanitary and storm water sewer wells are now located quite high above ground level - this entire area will be filled with sand. 

 

The heating line is brought inside the building. All the equipment of the heat distribution station, once welded and piped, will provide the building with heat. 

 

The heat supply line is being installed in the O&A, too. The power supply system is distributed to the premises. 

 

Enjoy watching, subscribe to our social media, stay up to date with all the events that are happening in the life of the project! 

 

Today, everyone can influence the pace of work both inside and outside the building, both documentation and development work, as well as the pace of preparing a production batch of angle grinders by investing. And to get the most out of it, take advantage of the new "Thank You" offer. Learn more about it by following this link.

https://reg.solargroup.pro/amx480/06

https://reg.solargroup.pro/amx480

 

Like
4
Zoeken
Categorieën
Read More
Other
Progress on the "SOVELMASH" project
Little by little, the project is gaining ground. Sovelmash the technology of the future. ...
By Konan Firmin Kouakou 2023-07-06 08:51:50 2 10K
Other
여행
풍경
By Hyuntae Park 2023-09-27 11:08:12 4 7K
Causes
Chăm chỉ và làm đúng luật
Khi có 1 đồng tiền mới xuất hiện, bạn có rất nhiều cơ hội để sở hữu nó miễn...
By Slt n15 2023-10-15 03:39:58 9 17K
Other
签到学习
签到学习,熟悉生态,增加算力,静待花开。
By 根在河洛 C 2023-12-07 06:44:32 3 9K
Networking
新店即将开业
㊗老婆新店开业大吉!生意兴隆!
By Juliang Chen 2023-05-26 02:33:43 2 11K