Progress of work on the BTEI (Bureau d'Etudes Techniques et d'Ingénierie) site

2
11كيلو بايت

​​📌What's going on at the "Sovelmash" D&E construction site today? 

 

At the D&E site, the utility sewer is being connected, sand backfilling is in progress, work is underway to connect the heating system, and preparations are being made to connect the storm drainage system. 

 

Dmitriy Duyunov: "There is some chance that today could be a landmark day. After months of extensive and strenuous work to install the engineering networks, the first of these (utility sewerage) has reached its connection point. All what's left is to make the connection. Now the entire pavement in front of our site, from gate to gate, is cluttered with pallets of construction mixtures for finishing the O&A. The installation of the heating pipes on the second and third floors of the O&A has been completed and moved to the 1st floor." 

 

It's high time to build up your investment portfolio and support the project! The construction pace depends on the rate of funding.

https://reg.solargroup.pro/amx480/06

https://reg.solargroup.pro/amx480

 

Like
Yay
6
البحث
الأقسام
إقرأ المزيد
أخرى
Pitogo Introduces P2P Tourism: Empowering Pioneers Worldwide
Have you ever stumbled upon a hidden gem, a picturesque spot known only to locals? Do you believe...
بواسطة Pitogo 2024-05-05 08:05:20 67 42كيلو بايت
الرئيسية
印尼苏门答腊岛棉兰的
老照片
بواسطة Xiaomin Xiaominyang 2023-06-25 03:45:09 2 8كيلو بايت
Art
Ten Haikus on Pi Network
1. Pi Network's charm, Promising financial freedom, Hope in every block. 2. Mining to find...
بواسطة Arven De La Cruz 2023-10-10 10:24:03 2 8كيلو بايت
أخرى
여행
풍경
بواسطة Hyuntae Park 2023-09-02 10:34:55 1 7كيلو بايت
Art
520
㊗派友520快乐!
بواسطة Juliang Chen 2023-05-20 02:36:08 6 20كيلو بايت