Sponsor

Progress of work on the BTEI (Bureau d'Etudes Techniques et d'Ingénierie) site

2
11K

​​📌What's going on at the "Sovelmash" D&E construction site today? 

 

At the D&E site, the utility sewer is being connected, sand backfilling is in progress, work is underway to connect the heating system, and preparations are being made to connect the storm drainage system. 

 

Dmitriy Duyunov: "There is some chance that today could be a landmark day. After months of extensive and strenuous work to install the engineering networks, the first of these (utility sewerage) has reached its connection point. All what's left is to make the connection. Now the entire pavement in front of our site, from gate to gate, is cluttered with pallets of construction mixtures for finishing the O&A. The installation of the heating pipes on the second and third floors of the O&A has been completed and moved to the 1st floor." 

 

It's high time to build up your investment portfolio and support the project! The construction pace depends on the rate of funding.

https://reg.solargroup.pro/amx480/06

https://reg.solargroup.pro/amx480

 

Like
Yay
6
Căutare
Categorii
Citeste mai mult
Alte
안녕하세요?
처음입니다. 잘 부탁합니다. 생초보라서 홈페이지 안내나 설명이 있으면 좋겠습니다.    
By Hyunki Je 2023-11-04 09:15:48 4 7K
Causes
道法自然兀转乾坤
坚定信念静待花开
By 凡 昝 2023-07-13 09:19:26 0 9K
Networking
Pi Network
Invite Code Pi: marketing2020 💞⚡🍕  
By Duy Truong 2023-07-30 11:13:24 4 10K
Alte
Pitogo Introduces P2P Tourism: Empowering Pioneers Worldwide
Have you ever stumbled upon a hidden gem, a picturesque spot known only to locals? Do you believe...
By Pitogo 2024-05-05 08:05:20 67 45K
Alte
我的香草园
西洋蓍草开始开花🌼了,看看香草们感觉真好!
By Yh Lin 2023-04-06 21:37:22 3 9K