Commandité

Progress of work on the BTEI (Bureau d'Etudes Techniques et d'Ingénierie) site

2
11KB

​​📌What's going on at the "Sovelmash" D&E construction site today? 

 

At the D&E site, the utility sewer is being connected, sand backfilling is in progress, work is underway to connect the heating system, and preparations are being made to connect the storm drainage system. 

 

Dmitriy Duyunov: "There is some chance that today could be a landmark day. After months of extensive and strenuous work to install the engineering networks, the first of these (utility sewerage) has reached its connection point. All what's left is to make the connection. Now the entire pavement in front of our site, from gate to gate, is cluttered with pallets of construction mixtures for finishing the O&A. The installation of the heating pipes on the second and third floors of the O&A has been completed and moved to the 1st floor." 

 

It's high time to build up your investment portfolio and support the project! The construction pace depends on the rate of funding.

https://reg.solargroup.pro/amx480/06

https://reg.solargroup.pro/amx480

 

Like
Yay
6
Rechercher
Catégories
Lire la suite
Autre
LONG THƯ TỊNH ĐỘ
2 Viết bài ĐANG THEO DÕI Khác LONG THƯ TỊNH ĐỘ Pháp Môn Tịnh Độ...
Par PHAM TRAM 2023-04-09 10:34:41 1 10KB
Autre
Thế giới đang trong thời gian hỗn độn
Bước ngoặt của lịch sử thế giới, chuyển đổi công nghệ số một mốc lịch sử quan trọng để đưa...
Par Baol Ien15 2023-07-04 01:37:52 1 9KB
Domicile
Crypto News
Bitcoin sẽ đạt 100.000 đô la? Một nhà phân tích chỉ ra một biến động...
Par Qalab A1985 2023-03-16 04:06:23 3 12KB
Domicile
贵贵
俺养了五六年滴~贵贵同学
Par 奶瓶 大侠 2023-05-22 04:40:39 0 8KB
Autre
Pinetwork update
Pi Network’s protocol upgrades will enable functionalities including embedding KYC...
Par BARUTWANAYO Deo 2025-09-05 16:46:56 1 4KB