Gesponsert

Progress of work on the BTEI (Bureau d'Etudes Techniques et d'Ingénierie) site

2
11KB

​​📌What's going on at the "Sovelmash" D&E construction site today? 

 

At the D&E site, the utility sewer is being connected, sand backfilling is in progress, work is underway to connect the heating system, and preparations are being made to connect the storm drainage system. 

 

Dmitriy Duyunov: "There is some chance that today could be a landmark day. After months of extensive and strenuous work to install the engineering networks, the first of these (utility sewerage) has reached its connection point. All what's left is to make the connection. Now the entire pavement in front of our site, from gate to gate, is cluttered with pallets of construction mixtures for finishing the O&A. The installation of the heating pipes on the second and third floors of the O&A has been completed and moved to the 1st floor." 

 

It's high time to build up your investment portfolio and support the project! The construction pace depends on the rate of funding.

https://reg.solargroup.pro/amx480/06

https://reg.solargroup.pro/amx480

 

Like
Yay
6
Suche
Kategorien
Mehr lesen
Food
阳丰脆柿
阳丰脆柿,脆甜可口,像巧克力一样
Von Td Ego 2023-10-14 22:10:59 3 10KB
Networking
Why I Am Into Pi Network?
Pi Network is a cryptocurrency project that aims to create a decentralized and user-friendly...
Von Arven De La Cruz 2023-10-09 10:27:24 2 10KB
Startseite
행복한 주말
파이는 나에게 주중 주말에도 늘 행복한 시간입니다
Von Syt Hda 2023-12-02 07:33:50 4 8KB
Literature
努力提升自己
超赞的一句话:“好的生活状态,不是仰望别人,而是把自己活成一道风景。”记住一个道理:只要自己变优秀了,其他的事情才会跟着好起来;无论何时,与其仰视,羡慕他人,不如花时间充...
Von Liu Jingdong 2023-07-10 10:33:22 2 10KB
Art
Nghệ nhân cắm hoa cao tuổi.
Tuổi nghề trên 50 năm. 
Von Thụ Nguyễn 2023-03-08 05:37:43 5 10KB