Patrocinado

Progress of work on the BTEI (Bureau d'Etudes Techniques et d'Ingénierie) site

2
11KB

​​📌What's going on at the "Sovelmash" D&E construction site today? 

 

At the D&E site, the utility sewer is being connected, sand backfilling is in progress, work is underway to connect the heating system, and preparations are being made to connect the storm drainage system. 

 

Dmitriy Duyunov: "There is some chance that today could be a landmark day. After months of extensive and strenuous work to install the engineering networks, the first of these (utility sewerage) has reached its connection point. All what's left is to make the connection. Now the entire pavement in front of our site, from gate to gate, is cluttered with pallets of construction mixtures for finishing the O&A. The installation of the heating pipes on the second and third floors of the O&A has been completed and moved to the 1st floor." 

 

It's high time to build up your investment portfolio and support the project! The construction pace depends on the rate of funding.

https://reg.solargroup.pro/amx480/06

https://reg.solargroup.pro/amx480

 

Like
Yay
6
Pesquisar
Categorias
Leia mais
Início
Pi network
Cái bánh gần chính rồi, sẽ chia đều cho mọi người tùy vào...
Por Anhkiet77 Huynh 2023-05-07 19:09:09 8 9KB
Outro
Khổ qua
Khổ qua
Por Kim Phan 2023-08-13 12:13:21 3 9KB
Outro
LONG THƯ TỊNH ĐỘ
2 Viết bài ĐANG THEO DÕI Khác LONG THƯ TỊNH ĐỘ Pháp Môn Tịnh Độ...
Por PHAM TRAM 2023-04-09 10:34:41 1 10KB
Início
Pi network
Ngày mới tốt lành 
Por Anhkiet77 Huynh 2023-05-07 04:49:01 9 9KB
Início
Crypto News
Arbitrum (ARB) outperforms Bitcoin (BTC) network in terms of transaction fees  ...
Por Qalab A1985 2023-04-27 09:08:04 3 11KB