​​📌What's going on at the "Sovelmash" D&E construction site today? 

 

At the D&E site, the utility sewer is being connected, sand backfilling is in progress, work is underway to connect the heating system, and preparations are being made to connect the storm drainage system. 

 

Dmitriy Duyunov: "There is some chance that today could be a landmark day. After months of extensive and strenuous work to install the engineering networks, the first of these (utility sewerage) has reached its connection point. All what's left is to make the connection. Now the entire pavement in front of our site, from gate to gate, is cluttered with pallets of construction mixtures for finishing the O&A. The installation of the heating pipes on the second and third floors of the O&A has been completed and moved to the 1st floor." 

 

It's high time to build up your investment portfolio and support the project! The construction pace depends on the rate of funding.

https://reg.solargroup.pro/amx480/06

https://reg.solargroup.pro/amx480

 

Like
Yay
6
Pesquisar
Categorias
Leia mais
Outro
여행
풍경
Por Hyuntae Park 2023-09-09 01:54:44 1 7KB
Outro
Cây cổ thụ 2000 năm tuổi
Cây cổ thụ 2.000 năm tuổi ở Tule, Oaxaca, Mexico. Nó có đường kính...
Por hiepyahu Ngo 2023-05-26 08:38:52 7 14KB
Início
Cuốn sách CHIẾN TRANH TIỀN TỆ NÓI VỀ THẾ GIỚI SẼ RA MẮT 1 ĐỒNG TIỀN vào đầu năm 2024
Chúng ta sẽ chờ đón sự kiện này nhé! Những người khai thác Pi...
Por Luon Gnh82 2023-04-18 02:19:31 2 12KB
Food
树上熟人参果
树上熟人参果,纯甜多汁
Por Td Ego 2023-10-24 14:55:30 3 10KB
Outro
넓은 바다
수평선
Por Hyuntae Park 2023-07-18 03:36:17 4 7KB