Progress of work on the BTEI (Bureau d'Etudes Techniques et d'Ingénierie) site

2
11K

​​📌What's going on at the "Sovelmash" D&E construction site today? 

 

At the D&E site, the utility sewer is being connected, sand backfilling is in progress, work is underway to connect the heating system, and preparations are being made to connect the storm drainage system. 

 

Dmitriy Duyunov: "There is some chance that today could be a landmark day. After months of extensive and strenuous work to install the engineering networks, the first of these (utility sewerage) has reached its connection point. All what's left is to make the connection. Now the entire pavement in front of our site, from gate to gate, is cluttered with pallets of construction mixtures for finishing the O&A. The installation of the heating pipes on the second and third floors of the O&A has been completed and moved to the 1st floor." 

 

It's high time to build up your investment portfolio and support the project! The construction pace depends on the rate of funding.

https://reg.solargroup.pro/amx480/06

https://reg.solargroup.pro/amx480

 

Like
Yay
6
Site içinde arama yapın
Kategoriler
Read More
Other
Hàng độc
Hàng độc
By Bichphu ong2710 2023-05-31 02:35:43 3 10K
Causes
The Local Representative Program
Local Representative Program   As a prominent player within the Pi Network ecosystem, we are...
By Pitogo 2023-08-22 08:03:33 113 39K
Art
美图
美图  
By 振通 瞿 2023-12-15 02:24:12 4 9K
Networking
Thời gian đếm ngược đến ngày Open Mainnet
Thời đại Web 3 sẽ dần thay thế chỗ những gì đã quá cũ kỹ 
By Qalab A1985 2023-04-12 03:02:15 4 11K
Gardening
Hoa đẹp
Hoa đẹp
By Kim Phan 2023-08-10 12:49:08 2 11K