Patrocinado

Progress of work on the BTEI (Bureau d'Etudes Techniques et d'Ingénierie) site

2
11K

​​📌What's going on at the "Sovelmash" D&E construction site today? 

 

At the D&E site, the utility sewer is being connected, sand backfilling is in progress, work is underway to connect the heating system, and preparations are being made to connect the storm drainage system. 

 

Dmitriy Duyunov: "There is some chance that today could be a landmark day. After months of extensive and strenuous work to install the engineering networks, the first of these (utility sewerage) has reached its connection point. All what's left is to make the connection. Now the entire pavement in front of our site, from gate to gate, is cluttered with pallets of construction mixtures for finishing the O&A. The installation of the heating pipes on the second and third floors of the O&A has been completed and moved to the 1st floor." 

 

It's high time to build up your investment portfolio and support the project! The construction pace depends on the rate of funding.

https://reg.solargroup.pro/amx480/06

https://reg.solargroup.pro/amx480

 

Like
Yay
6
Pesquisar
Categorias
Leia Mais
Início
Cuộc hành trình vạn dặm
Ở cuối mỗi con đường hầm đều có ánh sáng 🏃🚶🚵🏇
Por Qalab A1985 2023-03-26 09:35:36 3 11K
Film
Ducks
Vùng quê Tây ninh
Por Thắng Nguyễn Toàn 2023-08-06 05:39:54 4 10K
Food
千禧圣女果
千禧圣女果,皮薄脆甜,多汁
Por Td Ego 2023-10-25 21:04:05 2 10K
Food
秋月梨
秋月梨,脆甜多汁
Por Td Ego 2023-10-09 01:11:05 5 9K
Início
Hòn Sơn
Đảo Hòn Sơn (kiên giang)
Por Anhkiet77 Huynh 2023-09-15 14:35:54 4 11K